Hi,
Please clarify if we can use before-checkin trigger for this scenario. If yes could you please provide some samples or can we configure in plastic SCM windows client (GUI tool)?
I need to check if the revision number (a variable inside the file) in a *.c file need to be incremented each time I check-in. Currently the revision number is updated manually and sometime people forget to update the revision and its causing issue. My intention is to not to allow check-in of the file if the revision number is same before check-in.
Thanks in advance!!!