vozdemir Posted March 27, 2013 Report Share Posted March 27, 2013 There is Project key field in the preferences/issue tracking. If I write a project key here it is working with JIRA integration. But what if JIRA has many projects. Where can i write other project's key's? Is community edition works only one project? Link to comment Share on other sites More sharing options...
SilverKnight Posted March 28, 2013 Report Share Posted March 28, 2013 @vozdemir Take a look at this post. I am using the community edition too and just got this working. http://www.plasticscm.net/index.php?/topic/413-using-different-projet-key-with-different-repositories-jira/ Link to comment Share on other sites More sharing options...
vozdemir Posted March 28, 2013 Author Report Share Posted March 28, 2013 Thank you. I will try this. Link to comment Share on other sites More sharing options...
calbzam Posted April 1, 2013 Report Share Posted April 1, 2013 Yes, It´s possible to work with multiple project. This link explains the steps. Thank you SilverKnight Best regards, Carlos Link to comment Share on other sites More sharing options...
Aaron K Posted June 25, 2013 Report Share Posted June 25, 2013 Just to add that the MULTIPLE_PROJECTS Jira key in the Plastic preferences does work and that you need to name your branches prefixJIRAISSUENAME. eg scmMYPROJ-134 EDIT: OK, I've just performed some more checkins and I have to say that it's not working. The first checkin created a custom field (Customer Email??) and then the future checkins did not add anything to that field. I found some old docs about the custom field stuff and it made a new field called Plastic SCM and set the Field ID in the Plastic preferences to that id (10100). Future checkins did not show up (and neither did the Plastic SCM field) in Jira. Link to comment Share on other sites More sharing options...
calbzam Posted June 26, 2013 Report Share Posted June 26, 2013 Hi Aaron, I´ve done a basic multiple project sample (Jira 6), and it seems is working fine for me. In both branches "Atlassian Jira field" is created. If I modify the status in Jira issue, the info is transferred to Plastic. Which Plastic and Jira version are you using? Can yo give me the steps you followed to reproduce the issue? ) Regards,Carlos Link to comment Share on other sites More sharing options...